SKILLEMALL.ai

AB cx-commissioning-plan-drafter

Use this skill when a commissioning authority (CxA), building commissioning professional, MEP engineer, or owner's representative needs to draft a project commissioning plan aligned to ASHRAE Guideline 0-2019, LEED v4/v4.1 EA Prerequisite (Fundamental Commissioning), or federal/agency commissioning requirements. Covers commissioned systems scope, Cx team roles and responsibilities, project schedule, documentation and submittal requirements, functional performance test framework, and issues log protocol. Produces a DRAFT Cx Plan for CxA review before mechanical and electrical system installation begins.

ClawHub Agent Skills author: devasher v0.1.0 MIT-0 4 files body ≈ 3 481 tokens Open the sourceclawhub.ai analyzed 32 h ago

Use this skill when a commissioning authority (CxA), building commissioning professional, MEP engineer, or owner's representative needs to draft a project…

As a process B 75/100 · Nearly there — weak spots: when it triggers

GeneratorWriting and documentstype and topics are labelled automatically from the skill text
JSON
Technical rating
A
93/100
safety, quality, tests
Safety 60%
100
Quality 40%
82
Run on models
none yet
Process rating
B
75/100
Nearly there
When it triggers w 12
20
Failures and branches w 10
55
Tools and files w 18
60
the three weakest of ten parameters · all ten

How to improve

    For the model run — optional
    • Your own cases (evals/evals.json, 4–6 real requests with expected answers): the full check would then run those instead of a model-drafted suite.
    • A spec.yaml with trigger phrases and assertions — a behaviour contract for CI; `skilltest init` writes a template.

    Guard findings · 0

    ✓ No critical or high findings

    Files scanned: 4. Evidence is masked. Grey chips explain why severity was lowered.

    Against the Agent Skills spec

    ✓ No remarks against the Agent Skills spec

    Process rating: all ten parameters 75/100

    • 20When it triggers. No condition that starts the skill
    • 55Failures and branches. 1 branches
    • 60Tools and files. Uses tools (bash) that frontmatter does not declare
    • 70Inputs and preconditions. Inputs and preconditions are listed
    • 100Steps. 89 steps
    • 100Result and completion. Output format and completion criterion are stated
    • 100Consistency. Name and required fields are in place
    • 100Execution cost. Instruction body is 3481 tokens
    • 100Running it twice. No mutating operations
    • 100Progress reporting. Reports progress

    Everything here is measured from the skill text rather than judged by a model, so the numbers are checkable. A parameter weighs more when it is a more common reason for the process to stall.

    Quality signals

    • +5Description has no quoted example phrases that should trigger the skill
    • +4Description does not say when NOT to use the skill (false activations)
    • -5TODO / placeholder text left in the skill
    • +1No license
    • +2Single-language instructions
    • +3Description length 609: enough signal without eating the budget
    • +4Structure: 15 headings
    • +3Step-by-step instructions: 89 items
    • +3Output format is stated explicitly
    • +4Has examples (1 code blocks)

    Quality base 70; lint remarks subtract, signals add up to 100. Result: 82.

    External checks

    ClawHub: clean
    This skill is a straightforward drafting aid for commissioning plans and does not request unusual access or perform hidden actions.
    LLM: benign (high) · VirusTotal: · 2 Jun 2026