BB delay-claim-letter
Draft a construction delay notice or delay claim letter with contract clause citation, cause classification, and critical-path impact narrative. Use when asked to write a delay notice, put the owner or GC on notice of delay, draft a time extension request, respond to weather or owner-caused delay, or paper a delay for a claim. Produces a notice/claim letter with the excusable-compensable classification, critical-path impact narrative, quantum placeholder, reservation of rights, and a records-preservation list.
Draft a construction delay notice or delay claim letter with contract clause citation, cause classification, and critical-path impact narrative.
As a process B 72/100 · Nearly there — weak spots: when it triggers, running it twice, progress reporting
How to improve
- Your own cases (evals/evals.json, 4–6 real requests with expected answers): the full check would then run those instead of a model-drafted suite.
- A spec.yaml with trigger phrases and assertions — a behaviour contract for CI; `skilltest init` writes a template.
Guard findings · 0
✓ No critical or high findings
Files scanned: 2. Evidence is masked. Grey chips explain why severity was lowered.
Against the Agent Skills spec
- note
frontmatter-keyunknown frontmatter key "homepage"
Process rating: all ten parameters 72/100
- 0Progress reporting. Says nothing while it works
- 20When it triggers. No condition that starts the skill
- 30Running it twice. 3 mutating operations with no state check
- 55Failures and branches. 1 branches
- 60Result and completion. Output format stated, no completion criterion
- 70Inputs and preconditions. Inputs and preconditions are listed
- 100Tools and files. No external tools needed
- 100Steps. 21 steps
- 100Consistency. Name and required fields are in place
- 100Execution cost. Instruction body is 1434 tokens
Everything here is measured from the skill text rather than judged by a model, so the numbers are checkable. A parameter weighs more when it is a more common reason for the process to stall.
Quality signals
- +5Description has no quoted example phrases that should trigger the skill
- +4Description does not say when NOT to use the skill (false activations)
- +4No input/output examples
- +1No license
- +2Single-language instructions
- +3Description length 515: enough signal without eating the budget
- +4Structure: 8 headings
- +3Step-by-step instructions: 21 items
- +3Output format is stated explicitly
Quality base 70; lint remarks subtract, signals add up to 100. Result: 82.