SKILLEMALL.ai

BB project-risk-register

Identifies, assesses, and prioritizes project risks using probability-times-impact scoring (risk matrix), then assigns owners, mitigation plans, contingencies, and triggers to track risk evolution over the project lifecycle. Use when managing project uncertainty, building a risk register, conducting risk assessments, defining risk mitigation plans, or when user mentions risk register, risk management, probability-impact matrix, or asks "what could go wrong with this project?".

lyndonkl/claude Agent Skills author: lyndonkl 4 files body ≈ 3 267 tokens Open the sourcegithub.com↗ analyzed 16 h ago

Identifies, assesses, and prioritizes project risks using probability-times-impact scoring (risk matrix), then assigns owners, mitigation plans…

As a process B 66/100 · Nearly there — weak spots: result and completion, when it triggers, inputs and preconditions

AnalyzerInfrastructureResearchOperations and projectstype and topics are labelled automatically from the skill text
JSON
Technical rating
B
93/100
safety, quality, tests
Safety 60%
100
Quality 40%
82
Run on models
none yet
Process rating
B
66/100
Nearly there
Inputs and preconditions w 11
0
When it triggers w 12
20
Running it twice w 4
30
the three weakest of ten parameters · all ten

How to improve

    For the model run — optional
    • Your own cases (evals/evals.json, 4–6 real requests with expected answers): the full check would then run those instead of a model-drafted suite.
    • A spec.yaml with trigger phrases and assertions — a behaviour contract for CI; `skilltest init` writes a template.

    Guard findings · 0

    ✓ No critical or high findings

    Files scanned: 4. Evidence is masked. Grey chips explain why severity was lowered.

    Against the Agent Skills spec

    • note edit-residue the text marks something as outdated (lines 38): check that old rules are not kept next to new ones — the full check reads the text for contradictions

    Process rating: all ten parameters 66/100

    • 0Inputs and preconditions. Does not say what the process needs to start
    • 20When it triggers. No condition that starts the skill
    • 30Running it twice. 2 mutating operations with no state check
    • 40Result and completion. Does not say what the result is
    • 85Steps. 102 steps, 1 vague phrases
    • 100Tools and files. No external tools needed
    • 100Failures and branches. 1 branches, has a failure section
    • 100Consistency. Name and required fields are in place
    • 100Execution cost. Instruction body is 3267 tokens
    • 100Progress reporting. Reports progress
    • medium Safety rules and hard prohibitions inside a skill: they belong in the system prompt, here they protect nothing

    Everything here is measured from the skill text rather than judged by a model, so the numbers are checkable. A parameter weighs more when it is a more common reason for the process to stall.

    Quality signals

    • +5Description has no quoted example phrases that should trigger the skill
    • +4Description does not say when NOT to use the skill (false activations)
    • +3Output format is not stated: the model decides each time
    • -216 emoji in the instructions: noise for the model
    • +1No license
    • +2Single-language instructions
    • +3Description length 481: enough signal without eating the budget
    • +4Structure: 7 headings
    • +3Step-by-step instructions: 102 items
    • +4Has examples (2 code blocks)

    Quality base 70; lint remarks subtract, signals add up to 100. Result: 82.