SKILLEMALL.ai

AB delay-claim-letter

Draft a construction delay notice or delay claim letter with contract clause citation, cause classification, and critical-path impact narrative. Use when asked to write a delay notice, put the owner or GC on notice of delay, draft a time extension request, respond to weather or owner-caused delay, or paper a delay for a claim. Produces a notice/claim letter with the excusable-compensable classification, critical-path impact narrative, quantum placeholder, reservation of rights, and a records-preservation list.

mohitagw15856/pm-claude-skills Agent Skills author: mohitagw15856 MIT 1 file body ≈ 1 481 tokens Open the sourcegithub.com↗ analyzed 6 d ago

Draft a construction delay notice or delay claim letter with contract clause citation, cause classification, and critical-path impact narrative.

As a process B 72/100 · Nearly there — weak spots: when it triggers, running it twice, progress reporting

GeneratorLegalResearchtype and topics are labelled automatically from the skill text
JSON
Technical rating
A
95/100
safety, quality, tests
Safety 60%
100
Quality 40%
87
Run on models
none yet
Process rating
B
72/100
Nearly there
Progress reporting w 2
0
When it triggers w 12
20
Running it twice w 4
30
the three weakest of ten parameters · all ten
This is a copy of a skill from another catalog; the rating counts the canonical one: delay-claim-letter (mohitagw15856/pm-claude-skills)

How to improve

    For the model run — optional
    • Your own cases (evals/evals.json, 4–6 real requests with expected answers): the full check would then run those instead of a model-drafted suite.
    • A spec.yaml with trigger phrases and assertions — a behaviour contract for CI; `skilltest init` writes a template.

    Guard findings · 0

    ✓ No critical or high findings

    Files scanned: 1. Evidence is masked. Grey chips explain why severity was lowered.

    Against the Agent Skills spec

    ✓ No remarks against the Agent Skills spec

    Process rating: all ten parameters 72/100

    • 0Progress reporting. Says nothing while it works
    • 20When it triggers. No condition that starts the skill
    • 30Running it twice. 3 mutating operations with no state check
    • 55Failures and branches. 1 branches
    • 60Result and completion. Output format stated, no completion criterion
    • 70Inputs and preconditions. Inputs and preconditions are listed
    • 100Tools and files. No external tools needed
    • 100Steps. 26 steps
    • 100Consistency. Name and required fields are in place
    • 100Execution cost. Instruction body is 1481 tokens

    Everything here is measured from the skill text rather than judged by a model, so the numbers are checkable. A parameter weighs more when it is a more common reason for the process to stall.

    Quality signals

    • +5Description has no quoted example phrases that should trigger the skill
    • +4Description does not say when NOT to use the skill (false activations)
    • +1No license
    • +2Single-language instructions
    • +3Description length 515: enough signal without eating the budget
    • +4Structure: 9 headings
    • +3Step-by-step instructions: 26 items
    • +3Output format is stated explicitly
    • +4Has examples (0 code blocks)

    Quality base 70; lint remarks subtract, signals add up to 100. Result: 87.