Build and maintain a project or product risk register. Use when asked to create a risk register, identify project risks, build a risk matrix, or document risks and mitigations for a programme. Produces a complete risk register with likelihood/impact scoring, RAG status, ownership, and prioritised mitigations.
Build and maintain a project or product risk register.
As a process B 69/100 · Nearly there — weak spots: when it triggers, failures and branches, running it twice
How to improve
- Your own cases (evals/evals.json, 4–6 real requests with expected answers): the full check would then run those instead of a model-drafted suite.
- A spec.yaml with trigger phrases and assertions — a behaviour contract for CI; `skilltest init` writes a template.
Guard findings · 0
✓ No critical or high findings
Files scanned: 1. Evidence is masked. Grey chips explain why severity was lowered.
Against the Agent Skills spec
✓ No remarks against the Agent Skills spec
Process rating: all ten parameters 69/100
- 0Failures and branches. Linear process with no failure handling
- 20When it triggers. No condition that starts the skill
- 30Running it twice. 6 mutating operations with no state check
- 60Result and completion. Output format stated, no completion criterion
- 70Inputs and preconditions. Inputs and preconditions are listed
- 100Tools and files. No external tools needed
- 100Steps. 57 steps
- 100Consistency. Name and required fields are in place
- 100Execution cost. Instruction body is 2211 tokens
- 100Progress reporting. Reports progress
- medium Safety rules and hard prohibitions inside a skill: they belong in the system prompt, here they protect nothing
- low 12 top-level sections: this looks like several domains in one skill
Everything here is measured from the skill text rather than judged by a model, so the numbers are checkable. A parameter weighs more when it is a more common reason for the process to stall.
Quality signals
- +5Description has no quoted example phrases that should trigger the skill
- +4Description does not say when NOT to use the skill (false activations)
- -5TODO / placeholder text left in the skill
- -214 emoji in the instructions: noise for the model
- +1No license
- +2Single-language instructions
- +3Description length 310: enough signal without eating the budget
- +4Structure: 21 headings
- +3Step-by-step instructions: 57 items
- +3Output format is stated explicitly
- +4Has examples (1 code blocks)
Quality base 70; lint remarks subtract, signals add up to 100. Result: 80.