Skill rating
28 skills. The A–F grade combines safety (60%) and quality (40%); tests add a bonus. The rating refreshes automatically from open catalogs.
ManufacturingLogistics and warehouseProcurementQuality controlContact centreField serviceFinanceCustomer supportindustry shortcuts
| # | Grade | Skill | Score ▾ | Safety | Quality | Process | Tests | Popularity | Updated |
|---|---|---|---|---|---|---|---|---|---|
| 1 | A | When throughput or latency is pipeline-limited, identify the single binding constraint and exploit, subordinate, elevate, then recheck—ignore non-constraints. | 100 | 87 | C | — | — | 4 d ago | |
| 2 | A | Use when a specific claim may lack grounding. Check evidence boundary, size wrongness cost, then answer, fetch, or abstain — never confabulate. | 100 | 87 | C | — | — | 4 d ago | |
| 3 | A | Use when search or investigation could run forever. Set an explicit good-enough threshold first, then stop at the first option that clears it. | 100 | 87 | C | — | — | 4 d ago | |
| 4 | A | When one mental model leaves a material blind spot on a multi-domain or high-stakes problem, sequence complementary models with named roles and a conflict rule. | 100 | 87 | C | — | — | 4 d ago | |
| 5 | A | thinking-scientific-methodProcedureResearchSoftware developmenttjboudreaux/cc-thinking-skillsClaude Code When a symptom has several plausible causes, rank falsifiable hypotheses and run the cheapest discriminating observation first; prefer least-assumptive survivors only after evidence fit. | 100 | 87 | C | — | — | 4 d ago | |
| 6 | A | When provisioning, setting a limit, or committing an estimate under uncertainty, size a buffer to residual error and the cost of breach—not to the optimistic edge. | 100 | 87 | C | — | — | 4 d ago | |
| 7 | A | Before committing scarce time, people, or money, name the best forgone use of those resources and the value delta of the chosen path versus that alternative. | 100 | 87 | B | — | — | 4 d ago | |
| 8 | A | Deciding what to build or why adoption fails. Recover the progress users hire a solution for under a circumstance, then rank by outcome and competing workarounds. | 100 | 87 | C | — | — | 4 d ago | |
| 9 | A | thinking-five-whys-plusProcedureData and analyticsSoftware developmenttjboudreaux/cc-thinking-skillsClaude Code When a fault is localized and the proximate cause is known but the systemic root is not, chain evidence-linked whys with a counterfactual stop and a countermeasure. | 100 | 87 | C | — | — | 4 d ago | |
| 10 | A | thinking-map-territoryProcedureData and analyticsSoftware developmenttjboudreaux/cc-thinking-skillsClaude Code When a claim, doc, test, metric, or assumption conflicts with observed behavior, stop theorizing from the map and verify the live code or data; let territory overrule. | 100 | 87 | C | — | — | 4 d ago | |
| 11 | A | Before heavy deliberation, classify the decision as cheap or costly to undo; decide two-way doors fast and stage one-way doors to preserve options. | 100 | 87 | B | — | — | 4 d ago | |
| 12 | A | Before rejecting a proposal or reflexively agreeing, build the strongest faithful opposing case, state agreement conditions, then update or reaffirm. | 100 | 87 | B | — | — | 4 d ago | |
| 13 | A | Use when longevity of a non-perishable option matters. Treat survival duration as a remaining-life prior, then check domain drift before favoring the proven. | 100 | 87 | B | — | — | 4 d ago | |
| 14 | A | thinking-model-routerProcedureSoftware developmentPersonal productivitytjboudreaux/cc-thinking-skillsClaude Code When unsure which thinking skill fits, map domain and problem type, then return NONE or one primary skill by default (at most three complementary). | 100 | 87 | B | — | — | 4 d ago | |
| 15 | A | When a change has effects past the immediate fix—incentives, scale, feedback—trace consequence chains with timing and probability before committing. | 100 | 87 | C | — | — | 4 d ago | |
| 16 | A | Use when the reflex is to add a feature, layer, or process. Prefer removing harmful or nonessential elements first, with an irreversibility guard before deletion. | 100 | 87 | C | — | — | 4 d ago | |
| 17 | A | thinking-socraticProcedureSoftware developmentData and analyticstjboudreaux/cc-thinking-skillsClaude Code When a request is vague, assumption-laden, or "obvious," ask the few load-bearing questions that expose hidden requirements before building or committing. | 100 | 87 | B | — | — | 4 d ago | |
| 18 | A | thinking-systemsProcedureSoftware developmentInfrastructuretjboudreaux/cc-thinking-skillsClaude Code When behavior is emergent across components—fixes elsewhere break, loops/delays dominate—map boundary, stocks/flows, feedback, archetypes, then rank leverage. | 100 | 87 | C | — | — | 4 d ago | |
| 19 | B | For authorized security review of code, auth, or APIs you control, model the attacker, map the attack surface, and report only findings with a reproducible exploit path and verified mitigation. | 98 | 87 | C | — | — | 4 d ago | |
| 20 | B | thinking-cynefinProcedureInfrastructureOperations and projectstjboudreaux/cc-thinking-skillsClaude Code When the right response mode is unclear, classify the cause-effect domain first; decompose disorder. | 100 | 84 | C | — | — | 4 d ago | |
| 21 | B | thinking-thought-experimentProcedureSoftware developmentInfrastructuretjboudreaux/cc-thinking-skillsClaude Code When a real test is too rare, large, or irreversible, run a controlled counterfactual: isolate one variable, fix conditions, trace the mechanistic chain, and bound what the result implies. | 100 | 83 | B | — | — | 4 d ago | |
| 22 | B | When a constraint is treated as fixed, separate physics from convention, keep only independently supported primitives, and rebuild the simplest solution that satisfies real constraints. | 100 | 83 | B | — | — | 4 d ago | |
| 23 | B | Use when a selective defect needs IS/IS-NOT difference analysis or a consequential option choice needs must/want weighting and adverse-consequence comparison. | 100 | 83 | B | — | — | 4 d ago | |
| 24 | B | Use when forecasting, estimating, or sizing risk — anchor on base rates, give ranges, update prior→likelihood→posterior on evidence, and factor unmeasured quantities into order-of-magnitude bounds. | 100 | 83 | C | — | — | 4 d ago | |
| 25 | B | Under genuine uncertainty with no reliable forecast, inventory means, cap downside at affordable loss, act for commitments, and let goals emerge from controllable moves. | 100 | 83 | C | — | — | 4 d ago | |
| 26 | B | Before committing to a plan or launch, assume it already failed and reason backward through concrete causes — convert failure paths into mitigations, gates, and stop checks. | 100 | 83 | C | — | — | 4 d ago | |
| 27 | B | Use under time pressure when the situation is still changing and you must act before certainty — cycle Observe→Orient→Decide→Act on ~70% confidence, then re-observe. | 100 | 83 | B | — | — | 4 d ago | |
| 28 | B | When two design requirements seem mutually exclusive, name the contradiction, separate conflicting states, then invent a concrete no-compromise resolution. | 100 | 83 | B | — | — | 4 d ago |