SKILLEMALL.ai

Skill rating

74 skills. The A–F grade combines safety (60%) and quality (40%); tests add a bonus. The rating refreshes automatically from open catalogs.

74
#GradeSkillScore ▾SafetyQualityProcessTestsPopularityUpdated
1A
Breaks one epic into implementable stories with acceptance criteria. Use when the user wants stories for an epic or the next batch of work to build. Not for turning the whole design into epics.
969992B—★ 26 83326 h ago
2A
Turns the GDDs and architecture into epics, one per architectural module. Use when the user wants to break the game into epics or plan the work before writing stories. Not for splitting one epic into
969992B—★ 26 83326 h ago
3B
Implements one story in code with tests, following its ADRs. Use when the user says to build, implement or start working on a story. Not for checking readiness beforehand or closing the story after.
949987B—★ 26 83326 h ago
4B
Guides a first-time user through onboarding and picks the right workflow. Use when the user is new, just cloned or installed the studio, has no idea or engine yet, asks where to begin, or wants to bri
9410084C—★ 26 83326 h ago
5B
Builds a short list of must-do and never-do coding rules per system from accepted ADRs. Use when the user wants programmer rules or a cheat sheet from the ADRs, or needs it regenerated after ADR chang
939984B—★ 26 83326 h ago
6B
Finds architecture decisions (ADRs) made stale by a changed GDD and walks through resolving each. Use when the user changed a number or rule in a GDD and asks which ADRs or architecture decisions are
939984C—★ 26 83326 h ago
7B
Checks whether a story is ready to implement: clear acceptance criteria, no open questions, valid ADR and dependencies. Use when the user asks if a story, or the sprint's stories, are ready to start o
939983B—★ 26 83326 h ago
8B
Configure engine and version. Pins it in CLAUDE.md; WebSearch fills reference docs when the version is beyond LLM training data.
939984C—★ 26 83326 h ago
9B
Closes a finished story: verifies each acceptance criterion, checks for design or ADR deviations and updates its status. Use when the user says a story is done, finished or ready to close.
939983B—★ 26 83326 h ago
10B
Re-evaluate open bugs — priority vs severity, assign to sprints, surface systemic trends. Run when the count grows.
929981B—★ 26 83326 h ago
11B
Guides the user through finding and choosing a game concept. Use when the user wants game ideas, a new concept, a game jam idea, or to explore other directions, including dropping the current idea and
919980B—★ 26 83326 h ago
12C
Create an ADR documenting a technical decision: context, alternatives considered, consequences.
899973B—★ 26 83326 h ago
13C
Orchestrate the narrative team — narrative-director, writer, world-builder, level-designer — for story, world lore, narrative-driven levels.
899975B—★ 26 83326 h ago
14C
Orchestrate the live-ops team — live-ops-designer, economy-designer, analytics-engineer, community-manager, writer — for a season or live event.
899975B—★ 26 83326 h ago
15C
Orchestrate the combat team — game-designer, gameplay-programmer, ai-programmer, technical-artist, sound-designer, qa-tester — design through implement and validate.
899975B—★ 26 83326 h ago
16C
Orchestrate the polish team — performance-analyst, technical-artist, sound-designer, qa-tester — to optimize and harden a feature or area.
899975B—★ 26 83326 h ago
17C
What should I do next? Use when stuck or you don't know what to do.
899876C—★ 26 83326 h ago
18C
Quality review of test files and evidence — goes beyond existence, evaluates assertion coverage. ADEQUATE/INCOMPLETE/MISSING/NOT ASSESSED per story.
889972B—★ 26 83326 h ago
19C
Traceability matrix mapping GDD requirements to ADRs. Finds gaps, cross-ADR conflicts, engine compatibility. PASS/CONCERNS/NOT ASSESSED/FAIL.
889972C—★ 26 83326 h ago
20C
Author the architecture blueprint before code is written. Validates decisions against the pinned engine, flags knowledge gaps.
889972C—★ 26 83326 h ago
21C
Scan GDDs against the entity registry for cross-document conflicts. Grep-first approach targets conflicting sections, different stats.
889972B—★ 26 83326 h ago
22C
Holistic cross-GDD review — contradictions between systems, dominant strategies, economic imbalance, cognitive overload, pillar drift.
889972C—★ 26 83326 h ago
23C
Find flaky tests from CI logs — aggregates pass rates, spots intermittent failures, recommends quarantine. After multiple runs.
889972C—★ 26 83326 h ago
24C
Day-one launch patch — focused fix for known issues found after gold master. Mini-sprint with QA gate and rollback.
8810069C—★ 26 83326 h ago
25C
Generate engine-specific test helper libraries — assertion utilities, factory functions, mocks in the engine's test folder. Reduces boilerplate.
889972C—★ 26 83326 h ago
26C
Ready to advance between development phases? PASS/CONCERNS/NOT ASSESSED/FAIL with blockers and required artifacts. 'Can we move to production?'
889972C—★ 26 83326 h ago
27C
Orchestrate the level team — level-designer, narrative-director, world-builder, art-director, systems-designer, qa-tester — for complete area creation.
889972C—★ 26 83326 h ago
28C
Scaffold the test framework and CI — tests/ directory, engine test runner, GitHub Actions workflow. Once, before the first sprint.
889972C—★ 26 83326 h ago
29C
Concept prototype before GDDs — throwaway HTML, Engine or Paper build, PROCEED/PIVOT/KILL/NOT ASSESSED. After /brainstorm and /setup-engine.
889972C—★ 26 83326 h ago
30C
Validate a UX spec, HUD design or pattern library — accessibility, GDD alignment, readiness. APPROVED / NOT ASSESSED / NEEDS REVISION / MAJOR REVISION NEEDED.
889972C—★ 26 83326 h ago
31C
QA test plan for a sprint — classifies stories by Logic/Integration/Visual/UI, covers automated tests, manual cases, smoke scope.
889972B—★ 26 83326 h ago
32C
Emergency fix bypassing normal sprint process — hotfix branch, approvals tracked, backport verified, full audit trail.
8810069B—★ 26 83326 h ago
33C
Brownfield audit — do existing artifacts actually work? Numbered migration plan. Unlike /project-stage-detect, checks compliance not existence.
889972C—★ 26 83326 h ago
34C
Analyze project state, detect stage, identify gaps, recommend next steps. 'Where are we in development?'
879969C—★ 26 83326 h ago
35C
Map test coverage to GDD critical paths, find fixed bugs lacking regression tests, flag drift from new features.
879969C—★ 26 83326 h ago
36C
Structured playtest report template, or turn existing playtest notes into structured feedback.
879969D—★ 26 83326 h ago
37C
Section-by-section GDD authoring for one system — walks through each required section, cross-references dependencies.
879969C—★ 26 83326 h ago
38C
Improve a skill via a test-fix-retest loop — static checks, targeted fixes, keep or revert on score change.
879969C—★ 26 83326 h ago
39C
Performance profiling — find bottlenecks, measure against budgets, produce ranked optimization recommendations.
879969B—★ 26 83326 h ago
40C
Architectural code review — coding standards, SOLID, testability, performance concerns.
879969B—★ 26 83326 h ago
41C
Player-facing patch notes from git history and changelogs. Translates developer language into player communication.
879969B—★ 26 83326 h ago
42C
Scope creep check — current scope versus the original plan. Flags additions, quantifies bloat, recommends cuts. 'Any scope creep?'
8710067C—★ 26 83326 h ago
43C
Critical-path smoke gate before QA hand-off — runs the automated suite. A failed check means the build is not QA-ready.
879969C—★ 26 83326 h ago
44C
Per-asset visual specs plus AI generation prompts from GDDs and character profiles. After the art bible.
879969C—★ 26 83326 h ago
45C
Structured bug report from a description, or analyze code for potential bugs. Reproduction steps, severity.
879969C—★ 26 83326 h ago
46C
Soak test protocol for extended play — what to observe and log for slow leaks, fatigue, late-appearing edge cases.
879969C—★ 26 83326 h ago
47C
Onboarding doc for a new contributor or agent — project state, conventions, priorities relevant to the specified role.
879969C—★ 26 83326 h ago
48C
Launch readiness across every department: code, content, store, marketing, community, infrastructure, legal, go/no-go sign-offs.
869967C—★ 26 83326 h ago
49C
Milestone progress review — completeness, quality metrics, risk, go/no-go recommendation. At checkpoints or before a deadline.
869967B—★ 26 83326 h ago
50C
Fast, concise sprint snapshot — burndown and emerging risks for situational awareness. 'How is the sprint going?'
869867B—★ 26 83326 h ago