SKILLEMALL.ai

Skill rating

76 skills. The A–F grade combines safety (60%) and quality (40%); tests add a bonus. The rating refreshes automatically from open catalogs.

76
#GradeSkillScore ▾SafetyQualityProcessTestsPopularityUpdated
51A
Day 5 (Friday) sprint-closing move of a Design Sprint that produces the bundled Friday artifact covering per-customer interview observations, best quotes, scorecard grid (sprint questions by customers
9210079F will not run★ 66635 h ago
52A
Pre-sprint diagnostic that determines whether a team should run a Foundation Sprint now, postpone it, or do prerequisite work first. Produces a Go / Conditional Go / Wait verdict with diagnosis, recom
9210079F will not run★ 66635 h ago
53A
Day 1 morning move of a Foundation Sprint. Forces explicit team choices on target customer, important problem, team advantage, and competitors and alternatives. Produces a single coherent strategic fr
9210079F will not run★ 66635 h ago
54A
Pre-sprint diagnostic that determines whether a team should run a Design Sprint now, postpone it, or do prerequisite work first. Produces a Go / Conditional Go / Wait verdict with diagnosis, recommend
9210079F will not run★ 66635 h ago
55A
Pre-sprint brief that locks scope, the decision the sprint must unlock, team and role assignments, logistics, inputs to bring, and success criteria before Day 1 of a Foundation Sprint. Use after the r
9210079F will not run★ 66635 h ago
56A
Guides a contributor from a workflow idea to a complete Workflow Implementation Packet (draft workflow file, draft workflow command, cross-cutting update checklist) in a staging area for review. Runs
9210080F will not run★ 66635 h ago
57A
Day 2 (Tuesday) move of a Design Sprint that structures lightning demos and the four-step independent solution sketch protocol (Notes, Ideas, Crazy 8s, Solution Sketch). Each team member produces one
9210079F will not run★ 66635 h ago
58A
Pre-sprint brief that locks challenge, sprint questions, team and role assignments, customer recruiting plan, prototype medium, interview format, logistics, and success criteria before Monday of a Des
9210079F will not run★ 66635 h ago
59A
Guides contributors from a PM skill idea to a complete Skill Implementation Packet aligned with pm-skills conventions. Runs gap analysis, validates through a Why Gate, classifies by type and phase, ge
9210080F will not run★ 66635 h ago
60A
Run an ordered sequence of pm-skills against one input, pausing for go/no-go and stopping on a failed or empty step. Accepts a saved prioritized action plan (Mode A) or an ad-hoc named chain (Mode B;
9110077F will not run★ 66635 h ago
61C
601000D★ 66635 h ago
62C
601000D★ 66635 h ago
63C
601000F★ 66635 h ago
64C
601000F★ 66635 h ago
65C
601000F★ 66635 h ago
66A
Day 4 (Thursday) move of a Design Sprint that produces the planning artifact for the day. Output covers the prototype role plan (Maker, Stitcher, Writer, Asset Collector, Interviewer), prototype brief
9010074F will not run★ 66635 h ago
67A
Audits an existing pm-skills skill against structural conventions and quality criteria. Produces a structured validation report with pass/fail checks, severity-graded findings, and actionable recommen
9010075F will not run★ 66635 h ago
68A
Run adversarial review on a PM artifact via the pm-critic sub-agent. Returns findings graded P0/P1/P2/P3 with a concrete fix suggestion per finding and a machine-readable status block. Use after produ
9010076F will not run★ 66635 h ago
69B
Cross-meeting archaeology skill. Consumes multiple meeting recaps (or raw notes) over a period and surfaces patterns invisible in any single meeting. Shows how decisions evolved, who has been saying w
8910073F will not run★ 66635 h ago
70B
Produces async communication to stakeholders, primarily non-attendees and secondarily some attendees who want a reference. Translates meeting outcomes into what-it-means language for readers, with cha
8910073F will not run★ 66635 h ago
71B
Draft CHANGELOG entries from git log via the pm-changelog-curator sub-agent, applying the repo hygiene rules (describe what changed, public paths only, no attribution trailers). Returns a layered draf
8910073F will not run★ 66635 h ago
72B
Walk the guided 6-gate release runbook (G0 readiness, G1 adversarial review, G2 version bump and CHANGELOG, G2.5 commit and re-verify, G3 tag and push, G4 post-tag hygiene) via the pm-release-conducto
8910073F will not run★ 66635 h ago
73B
Produces an attendee-facing agenda that sets what will be discussed, who owns each topic, and how time will be spent. Supports ten meeting type variants (standup, planning, review, decision-making, br
8910073F will not run★ 66635 h ago
74B
Produces a private strategic preparation document for the user before a meeting that matters. Captures stakes, stakeholder positions and reads, ranked desired outcomes, key messages, anticipated quest
8910073F will not run★ 66635 h ago
75B
Produces a topic-segmented post-meeting summary for attendees with decisions highlighted and actions captured inline per topic (plus a consolidated action view at the end). Auto-populates topic skelet
8910073F will not run★ 66635 h ago
76B
Run a repo-wide cross-cutting governance audit via the pm-skill-auditor sub-agent. Aggregates the enforcing validator suite, re-derives aggregate counters, and surfaces cross-cutting issues no single
8910073F will not run★ 66635 h ago